The morning fog hung over the lake and the day started cool but warmed up nicely into the low to mid 20's or so.
Today was the first day we were able to get going with the framing. We had several volunteers today so we got a lot done. The drain pipe around the foundation was an added task with the extra help. By close of the day we had the front and back walls up and mostly sheeted. The two end walls are close to ready for setting in place. We are expecting a rain day tomorrow so things may slow down a little but that is what it is.