Wednesday, 9 October 2013

After a day off because of rain we were able to get back to work today. It was a lovely warm day so the dirt, gravel and insulation went in easily with lots of sweat.
 Branden doing a repair job on the chalk line
 Doreen leading the attack against the dirt

 The digger climbs over the wall without touching the concrete


 Suhyun working the compactor


 Carrying Styrofoam the Korean way
 Branden whittling on the trowel handles

 Plumber drilling through the foundation



The foundation is starting to come together. We hope to pour on Friday

No comments:

Post a Comment