Monday of the last week in South Korea.
Our day started a bit later than normal since it was quite frosty this morning. Our first task was to finish the sheathing of the gable ends. The big ones are about 30 feet from the ground.
Syhan and Keyoon kept working at the Tyvec house wrap
Hangraan is checking the nailing before the Tyvec is istalled.
Then we started to install the 29 windows and had to leave 4 for another day as the Tyvec was not installed.
These windows are very heavy because they are triple pane sealed units. It took all of us to do the Living Room window.
Last task of the day was to strip the forms from the front porch that we poured last week.
This is the South Facing side of the house. Only two windows left to install in the attic area.
North Facing side of the house.